Power faillure

Hello,

In 27.06.2018, from 9:30 until 12:30 GMT+2 there was a power faillure in our datacenter.

Both of our power lines failed and also the generator has failed.

27º Jun 2018
Main router changed

Hello,

We are pleased to announce you that we changed our linux gateway with a CISCO 6509 chassis.

Equipped with a Supervisor 720-3BXL

Installed:

- 1x X6708-10GE for upstream links
- 3x X6748-GE-TX
- 1x X6548-GE-TX
- 1x WS-X6516A-GBIC

All network traffic is supported now by this device.

All clients are directly connected to this.

25º Mar 2017
Power line maintanance

In 11.02.2017, 14:15 one of the main power line has been changed.

The power has came back to 15:00.

Downtime 45 min.

Clients affected: ALL


Sorry for trouble.

11º Feb 2017